- Main Raw Materials:
Direct Reduction Plant: Pellets from the pelletizing complex of Ardakan, belonging to Chadormalu Mining and Industrial Company
Steel Plant: DRI from the direct reduction plant of the project
- Equipment:
  • The electric arc furnace and the EAF and LF transformer and reactor of this project are designed and made by the Italian Tenova and Tamini companies respectively.
  • The continuous steel ingot casting machine is made by the Chinese MCC Company based on the basic design of Concast Company.
  • Most of the hydraulic equipment are manufactured by the Chinese Vickers Corporation.
  • Electrical and automation equipment of the project are procured from the Chinese ABB and other reputable companies.
  • Main equipment of the direct reduction plant are and the main rolling: Iran International Engineering Company (IRITEC)
  • The 400 KW electrical substation: Faraniroo Co.
  • Oxygen Plant: Sichuan Air Separation Group in China